• 2016: Power plant, in Jamnagar – India, pre-commissioning, commissioning and the required performance tests of all Fire detection and fire protection systems.
  • 2016: Power plant Durban –South Africa_ CO2 concentration test
  • 2016: Oil and Gas Facilities, Hassi berkin Station Algeria, Following Erection progress, pre-commissioning, commissioning and the required performance tests of the BOP Fire detection and fire protection systems
  • 2016: Combined cycle power plant project New Capital – EGYPT, Following Erection progress, pre-commissioning, commissioning and the required performance tests of the BOP Fire detection and fire protection systems
  • 2016: Ship building Ulsan-Korea, Pre-commissioning activities
  • 2016: Power plant Suez canal –Egypt : Commissioning pump station
  • 2016: Combined cycle power plant 1×400 MW, in Sousse C – Tunisia: Annual maintenance for firefighting system
  • 2016: Power plant, in Luna Kashipus – India, pre-commissioning, commissioning and the required performance tests of all Fire detection and fire protection systems.
  • 2015-2016: Gas turbines power plant 3×220 MW, in Hassi Massaoud – Algeria: Following Erection progress, pre-commissioning, commissioning and the required performance tests of all the Fire detection and fire protection systems.
  • 2014 -2016: Combined cycle power plant 1×400 MW, in Sousse D – Tunisia: Following Erection progress, pre-commissioning, commissioning and the required performance tests of the BOP Fire detection and fire protection systems.
  • 2015-2016: Power plant, in North Banghok– Thailand, pre-commissioning, commissioning and the required performance tests of all Fire detection and fire protection systems.
  • 2015-2016: Gas Turbines power plant 1000 MW, in New Assuit – Egypt: Following Erection progress, pre-commissioning, commissioning and the required performance tests of the BOP Fire detection and fire protection systems.
  • 2015-2016: Oil and Gas Facilities, in Hassi R’mel 2 – Algeria: pre-commissioning, commissioning and the required performance tests for the Fire detection and fire protection systems.
  • 2014-2016: Gas Turbines power plant 3×140 MW in Labreg – Algeria: Following Erection progress, pre-commissioning, commissioning and the required performance tests of all the Fire detection and fire protection systems.
  • 2015-2016: Oil and Gas Facilities, in In Salah – Algeria, pre-commissioning, commissioning and the required performance tests of diesel generators Fire detection and fire protection systems.
  • 2015: Industry, in Sohar – Oman, pre-commissioning, commissioning and the required performance tests of fire protection systems.
  • 2015: Power plant, in Bir El Msana – Algeria, pre-commissioning, commissioning and the required performance tests of all Fire detection and fire protection systems.
  • 2015: Steam coil Power plant, in TT2 – Colombia, pre-commissioning, commissioning and the required performance tests of all Fire detection and fire protection systems.
  • berkine 2015: Gas turbines power plant, in El Mahmoudia – Egypt: Following Erection progress, pre-commissioning, commissioning and the required performance tests of all Fire detection and fire protection systems.
  • 2015: Gas turbines power plant, in OMIFCO – Oman: commissioning andCO2 concentration tests.
  • 2015: Gas turbines power plant, in Hassi Berkine – Algeria: CO2 concentration tests.
  • 2015: Gas turbines power plant, in TFT – Algeria: CO2 concentration tests.
  • 2015: Gas Turbines power plant 500 MW, in New west Damietta – Egypt: Following Erection progress, pre-commissioning, commissioning and the required performance tests of the BOP Fire detection and fire protection systems.
  • 2014: Oil and Gas Facilities, in South park gas field – Iran, pre-commissioning, commissioning and the required performance tests of all Fire detection and fire protection systems.
  • 2014: Refinery, Tupras Izmit – Turkey, pre-commissioning, commissioning and the required performance tests of all Fire detection and fire protection systems.
  • 2014: Power plant, in Stah Alrar – Algeria, pre-commissioning, commissioning and the required performance tests of all Fire detection and fire protection systems.
  • 2013 – 2015: Combined cycle power plant 2x420MW in Deir Ali II – Syria: Project management, following erection progress, pre-commissioning, commissioning and the required performance tests of all the Fire detection and fire protection systems.
  • 2013-2014: Gas Turbines power plant 2×140 MW in Ain Djasser II – Algeria: Following Erection progress, pre-commissioning, commissioning and the required performance tests of all the Fire detection and fire protection systems.
  • 2012 2014: Combined cycle power plant 4x400MW in Terga – Algeria: Following Erection progress, pre-commissioning, commissioning and the required performance tests of the BOP Fire detection and fire protection systems.
  • 2012: Oil and Gas Facilities, in El Merk – Algeria: pre-commissioning, commissioning and the required performance tests of all the Fire detection and fire protection systems.